

Institutional and Infrastructure

HVAC & Roofing Upgrades

Villeneuve, AB
This project involves key upgrades to improve building performance and reliability. The scope included the installation of a new SBS roofing system, along with the replacement of existing HVAC infrastructure with new equipment and ducting. Electrical components were upgraded as required to support the new systems. These improvements enhance overall efficiency, durability, and long-term functionality of the facility.